Street Resurfacing (SM202201)
This street resurfacing project will rehabilitate seven major segments of roads consisting of three arterial roads and four collector roads totaling approximately 9,293 Linear Feet (LF) of road centerline. Between September 18, 2024 and October 28, 2024 the City completed street resurfacing at the following locations:
- Airway Boulevard from North Canyons Parkway through the Westbound I-580 ramp entrance.
- Clubhouse Drive
- Dalton Avenue from Broadmoor St. through Pasatiempo St.
- East Airway Boulevard around Sutter St.
- Greenville Road from Southfront Rd. through Las Positas Rd
- Las Positas Road from North Livermore Ave. through Hilliker Pl.
- Murrieta Boulevard from Portola Ave. to Huron Rd.
The improvements included base repairs, asphalt concrete (AC) overlay, new pavement striping, and installation of new vehicle detection cameras with upgraded equipment to one traffic signalized intersection (Las Positas Road at Hilliker Place). The pavement striping will include bike lane and crosswalk improvements per the Bicycle, Pedestrian, and Trails Active Transportation Plan.