Slurry Seal (SM202204)
This project will slurry seal various residential, collector and arterial streets, develop a design and prepare plans, cost estimates, and contract documents. The project is scheduled to go to construction in 2025. The streets selected are consistent with the City’s 2024 Pavement Management Budget Options Report prepared utilizing the StreetSaver database and Pavement Management Program tools.